DANGJIN, SOUTH KOREA
Views: 5 Author: Site Editor Publish Time: 2024-04-29 Origin: Site
Inquire
Two Sets of Tar removing Electrostatic Precipitator (ESP) Plants installed for Hyundai Steel in Dangjin, South Korea, 2014
Fluid: CO gas (COG)
Feed flow: 14000Nm3/hr
Inlet condition: 20mg/Nm3 (Max)
Outlet condition: 2 mg/Nm3 (Max)
Tar removal efficiency: 99% (Min)
Scope of supply: Rectifier panel, Transformer, Control panel, ESP tower (Pre-fabricated), E&I,HV cable
Type of contract: Engineering, Procurement, Fabrication & Project Management