Dangjin, South Korea

Two Sets of Tar removing Electrostatic Precipitator (ESP) Plants installed for Hyundai Steel in Dangjin, South Korea, 2014

Fluid: CO gas (COG)

Feed flow: 14000Nm3/hr

Inlet condition: 20mg/Nm3 (Max)

Outlet condition: 2 mg/Nm3 (Max)

Tar removal efficiency: 99% (Min)

Scope of supply: Rectifier panel, Transformer, Control panel, ESP tower (Pre-fabricated), E&I,HV cable

Type of contract: Engineering, Procurement, Fabrication & Project Management